I have been concidering the work involved, and all of the logistics of getting everything ready for the chains, and have come to a conclusion… There is very limited time. There are two things that are can help with this, and I cshall be utilising both options. The first is simple, I’m taking tomorrow off work to work on them.
The second is a minor change in the mould for the Rowany Device, and then recasting 24 of them. The change in the mould is to add 4 long tags to the devices so that I can use them as links instead of making/buying links and having to link each part. These are only temporary, so there’s no point in going all out, and then discarding the bought links afterwards. I shall make the modification tonight, and pour them, then test them with the 3 RR links I have… if they work, then I shall continue to fix the RR links and see howmany of them I can get poured. Hopefully with tomorrow off work, I should be able to get them finished in time to get them to Tyg so that she can add the plates.
Things are looking up.
But then nothing is ever as bad as it seems.