A new tact…

I have been concidering the work involved, and all of the logistics of getting everything ready for the chains, and have come to a conclusion…  There is very limited time.  There are two things that are can help with this, and I cshall be utilising both options.  The first is simple, I’m taking tomorrow off work to work on them.

The second is a minor change in the mould for the Rowany Device, and then recasting 24 of them.  The change in the mould is to add 4 long tags to the devices so that I can use them as links instead of making/buying links and having to link each part.  These are only temporary, so there’s no point in going all out, and then discarding the bought links afterwards.  I shall make the modification tonight, and pour them, then test them with the 3 RR links I have…  if they work, then I shall continue to fix the RR links and see howmany of them I can get poured.  Hopefully with tomorrow off work, I should be able to get them finished in time to get them to Tyg so that she can add the plates.

Things are looking up.  ;)   But then nothing is ever as bad as it seems. ;)


Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>